Quality control page banner — inspection bench or measuring gauge in use, 1600x400

Inspection & release

Quality Control

How orders are inspected and released before shipment — and what happens to a batch that does not pass.

Released by
Quality personnel
Applies to
Every batch
Checked against
Agreed spec, standards, samples
Documents
Per model, where confirmed

Four separate milestones

Each batch is released by designated quality personnel against the agreed specifications, applicable standards and approved samples. A batch is not treated as released just because manufacturing is finished: sales coordination, progress photos and shipping booking do not replace quality judgement.

  1. 01

    Manufacturing complete

    The batch is finished against the agreed specification.

  2. 02

    Inspection passed

    Checked by quality personnel, not by sales.

  3. 03

    Packing complete

    Packing is confirmed before the goods leave.

  4. 04

    Ready to ship

    Release is a separate step from booking the shipment.

What is checked on a batch

The basis for each check is the order itself: the agreed specification for the model and size, the applicable standards, and the approved sample. Figures come from that agreed specification — never from a general catalogue claim.

Checks applied to a batch and the basis each one is measured against
What is checkedChecked against
Dimensions and lengthThe agreed specification for that model and size
Working and burst pressureThe values confirmed for that model
Lining, cover and appearanceThe approved sample
Marking and packingThe order requirements, before loading
Test and certification documentsConfirmed evidence for that specific model
Inspection bench — hose sample, gauge and a batch tag with the agreed specification written on it, 1600x600
A batch is checked against the agreed specification and the approved sample — not against the previous batch.

Nonconforming batches

Held, not shipped

A batch that does not meet the agreed requirements is held and isolated from delivery. The factory proposes corrective action, and the batch is released only after re-inspection passes.

Any effect on the agreed date is confirmed with the customer in writing before the schedule changes.

Third-party inspection & documents

Where third-party inspection is agreed in the order, it is arranged as agreed and the goods are released after it passes.

Test or certification documents are provided per model when confirmed evidence exists for that specific model. Performance, standards and certification claims apply only to the model they are confirmed for — we do not present a general factory introduction as proof of a specific product's performance.

Inspection & packing timing

Inspection and packing time is evaluated per order and stated in the quotation or Proforma Invoice (PI) as extra time or an estimated ready-for-shipment date, separate from the production period.

Packing line — cartons marked with model and batch number before loading, tape and label visible, 1600x600
Packing is confirmed before the goods leave; inspection and packing time is stated separately from the production period.

Ask how your batch will be released

Tell us the model, size and quantity and we confirm how the batch is checked and what documents can be provided for that model.

Get a quote

Request a Quote

Tell us what you need. Our sales team replies within one sales business day.

Sent from this page: Quality Control

Need to upload drawings or a purchase list? Use the full inquiry form.